constructionAppointment encounter

General Contractor — Project Estimate

Inbound inquiry for a construction or renovation project. Captures project scope, timeline, and permit awareness.

13field definitions
4surface rules
4guardrail signals
4wrap-up checks

When this runs

classifies this work type when the caller says things like:

renovation
remodel
addition
kitchen remodel
bathroom remodel
basement finishing
deck
build
contractor
construction
ADU
home addition

How the call goes

4 surface rules tied to missing field definitions. Urgent first.

1

Clarify the project type — a kitchen facelift vs. full gut remodel vs. addition are very different scopes.

important

Can you walk me through what you're looking to do — is it a remodel, an addition, repairs, or something else?

Field: Project type (remodel / addition / new build / repair)

2

Ask about budget — helps us determine if the project is feasible as described and what trade-offs to suggest.

important

Do you have a budget range in mind? It helps us tailor the scope to what makes sense.

Field: Budget range

3

Ask about timing — some start dates aren't possible due to permit lead times or material order delays.

important

When are you hoping to start, or is there a deadline you're working toward?

Field: Desired start date or deadline

4

Ask if they have plans — saves time on the estimate if an architect has already drawn it up.

normal

Do you have any plans, drawings, or sketches for the project?

Field: Plans or drawings available

Extracted without a dedicated prompt

extracts these from the transcript in real time. If the caller does not mention them naturally, staff can confirm them during wrap-up.

Caller nameCallback numberEmailProject addressProject scope descriptionRooms or areas affectedAware permits may be requiredHOA approval neededLiving in home during construction

Guardrail signals

If staff says anything matching one of these examples, an urgent warning surface is created.

Quote a project cost before an on-site visit and detailed scope review.

Guarantee a completion date before subcontractor and permit scheduling.

Promise no change orders will be needed.

Start work without signed contract and permits.

When the call ends

Before staff can end the call, walks them through a wrap-up checklist, then prepares the captured fields for the work record.

Wrap-up checklist

  • Confirm project address
  • Confirm callback number
  • Schedule site visit
  • Send confirmation

Then creates a appointment encounter with:

  • Caller name
  • Callback number
  • Email
  • Project address
  • Project type (remodel / addition / new build / repair)
  • Project scope description
  • Rooms or areas affected
  • Desired start date or deadline
  • Plans or drawings available
  • Aware permits may be required
  • Budget range
  • HOA approval needed
  • Living in home during construction

Ready to put this work type to work?

Start your free trial and this work type is active on your first call. Customize it any time, or let it run as-is.

Sign up for trial

We use essential cookies to keep the app secure. Optional cookies help us improve reliability and measure campaigns. Cookie policy